MB-NG Documents by Task
Task 2 - Traffic Generation and Measurement: Equipment Provison
Task Leader: Richard Hughes-Jones
Definition
his task encompasses all of the work needed to define the types
of traffic we need to generate and use during the project, as
well as the measurement systems required to characterise the network,
and measure and demonstrate expected traffic behaviours.
A very important part of this task is to define the measurements
and presentations (e.g. plots) which will be used to demonstrate
that the project technical goals defined in task 1 have been achieved.
I.e. the success metrics.
This task is divided into three parts:
- definition of the load traffic and the software and hardware
is required to produce it;
- definition of the measurement systems required and specification
of the software and hardware is required;
- production of necessary software and scripts for both of
the above.
Notices
Date |
Information |
Contact |
2003/01/04 |
Current UCL Play Pen Configuration
|
Javier Orellana |
2002/10/08 |
Current UCL Play Pen Configuration
|
Frank Saka |
2002/07/08 |
Please supply notice information! |
Yee-Ting Li |
|
|
|
Schedule
Documents
Date |
Document |
Document ID |
Information |
Author |
Revision |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|